Bartlett, Live/Work under construction
|
The drywall defines the spaces and finally gives
the opportunity to see and feel the true size of
the rooms.
The crew that did the tape, float, and texture were not
to sure about having to create the hand textured finish
we wanted. But in the end they said they enjoyed
getting to do something a little more creative and left
the job proud of what they accomplished. As they
should have, it turned out stunning.
The interior trim work took several weeks due
to the dressing closet and the sales counter.
The insulation may not have been a necessity on the
side walls but it made a big difference in the long run.
We were glad to see the glass finally get installed it
was about to the point of needing to start locking the
building up.
The brick on the back wall and the courtyard walls
starting to take shape
The rest of the good pictures are lost in the dead computer as mentioned before. Most of what was left of the
construction process were the finishes which can be seen on the pages you linked in from.
If there is anything we can do for you, please do not hesitate to contact us.
|